"The Building of Miss Thriftway!"
Hull Construction Photos
2003 - 2006


Archived Photos from 2003 Archived Photos from 2004 Archived Photos from 2005
Jan 2006 Feb 2006 Mar 2006 Apr 2006 May 2006 Jun 2006
Jul 2006 Aug 2006 Sep 2006 Oct 2006 Nov 2006 Dec 2006



Viewers Hint:
All photos in this section are reduced in size (600x800) for quicker downloading. If you have a high speed connection and would like to see a particular photo at full size and higher resolution (1536x2048), add "Orig" (with a capital "O") to the address line:
    Open up the photo you want to view, then modify the address in the pop-up window
    Example---
    Normal Address:   http://www.missthriftway.com/Photos/hull/2006/6-04-22%2004.jpg
    Modified Address: http://www.missthriftway.com/Photos/hull/2006/Orig/6-04-22%2004.jpg





JANUARY 2006
January 7

The trailer at Wheelers
January 7

Step 1
Out and Rolled!
(see video)
January 7

Next move...to the trailer
January 7

View from an empty shop (first time in 2+ years)
January 7

Almost there
January 7

Step 2
ON the trailer
January 7

Step 3
In Larrys shop
January 7

Larry, Peter, Rob and Alan - it's lunch time!
January 21

Chief, Scooter and a drop-in helper Tom, sealing the interior
January 21

Completed! (view from back)
January 21

Completed! (view from front)
January 21

Spoiler
January 21

January 21

January 21

Chiefs "new"look
January 28

Ron Jones SR. watching as we lower our mock up engine into the boat for gearbox location
January 28

Lower...lower...lower...lower...
oh boy!
January 28

In position (well...sort of)
January 28

Ron and Rob discussing Strut location
January 28

Ron checking to see if the strut we have will work...it won't!

FEBRUARY 2006
February 4

Hull suspended above trailer so we can re-do the bunks.
February 4

Steve and Chief modifying the upright
February 4

All it needs is a wedge piece...
February 4

We got our new 3.0 gears for the second engine!
February 4

Right Side
February 4

Left Side
February 11

Water Manifold with check valves
February 11

Original hose holders
Sponson water pickups
February 11

Alan cleaning up the glue drips inside the spoiler
February 11

Aft bunks BEFORE
February 11

Rob welding the end plate after we cut the rail

MARCH 2006
March 4

Checking the new configuration.
March 4

Hold downs
March 4

Sponson support side
March 4

Almost full tilt in Larry's shop
March 4

Trailers out, hull is now on Dixon's roll arounds
March 4

Front view
March 4

Chief, Steve and Larry working on dry fitting the aft battens
March 4

New engine parts by Ron Brown
March 4

After the aft battens were fitted, Chief just couldn't resist breaking out the cowlings.
March 4

Chief REALLY can't wait!
March 4

Ahhhh...to dream of what will be
March 11

Battens, Battens and MORE Battens!
March 11

March 11

March 11

March 11


APRIL 2006

April 1

Engine & Hull together for the first time!
April 1

Larry getting ready to drill the hole for the thru hull rudder water pickup fittings.
April 1

Fitting plate in place.
April 1

Water pickup from the right sponson (just above the fuel tank)

April 1

Fittings in place
April 1

Alan and Larry working on the right sponson water pickup - Stuart and Rob sanding the interior getting ready to apply the final seal coat.
April 1

Skid Fin
April 1

Skid Fin
April 8

Steve hand planing one of the battens
April 8

Rob drilling a pin hole on the second engine
April 8

Hand plane shavings

April 8

Steve Checking the batten alignment

April 15

Rob drilling holes for the hose raceway
April 15

Sand, Sand, Sand, Sand...
April 15

Engine bank cooling overboard discharge
April 15

Bank discharge lines and fule pump return line
April 15

Fuel pump return line

April 22

More hose support conduit

April 22

Water hose
Battery cable
Stuffing box cooling check valve

April 22

Right side fuel spout & cooling discharge
April 22

Hoses will droop in this area to clear the intake hose & fuel spout
April 22

Chief with skid fin
April 22

SHARK!
April 22

Ready to roll
April 22

Rolling...
April 22

Are you SURE we want to do this?!
April 22

Skid fin - final check
April 22

Alan putting the finishing touches on the spoiler
April 22

Now there's a TOO familiar site
April 22

Partial bank used to test fit the locating block
April 29

Steve & Ron laying out the jig location
April 29

Alan & Rob removing as many screws as they can

April 29

This is where we WANT to go.
April 29

The Start
April 29

Through the bottom at the first frame
April 29

Keeping things lubed up with parafin

April 29

Alan doing the same from below
April 29

Top side crew, Lloyd on the wax, Ron and Larry on the drill, Chief on the watch
April 29


April 29

Approaching the second frame

April 29

Almost through
April 29

Just another couple of inches!

April 29

Looks like where we WANTED it!

April 29

Polish, polish, polish, polish...

MAY 2006

May 6

Lary and Steve polishing, Rob welding

May 6

Rob TRYING to get a good shot of the transom...just too bright!

May 6

Exhaust stacks removed getting ready for a test start in a couple of weeks.

May 6

Our SDP1300 Oil screen mounted (bracket by Wheeler)

May 6

That's a lot of aluminum to polish!!!!!

May 13

Stuarts reflection in the non-trip.

May 20

MORE Polish, polish, polish
Lloyd, Chief, Alan and Stuart

May 20

Dueling Drills

May 20

Steve cleaning the Hysol out of the pilot holes

May 20

Chief and Alan installing the Right Primary

May 20

Chief and Larry installing the Skid Fin

May 20

Right Sponson with all hardware in place

May 20

Left Sponson

May 20

Left Sponson

May 20

Left Sponson

May 20

Shiney and DONE!

May 27

Larry's 1955 GMC
WITH new windshield

May 27

Shop Oil tank

May 27

Masking, masking, masking...

May 27

MORE masking

May 27

Chief and Steve blowing off the dust

May 27

Rob put on the first two coats

May 27

Larry's turn!

May 27

Steve was the Mix Master

May 27

Shiney...

May 27

Steve checking to see if it's dry to the touch
It WAS!

JUNE 2006

June 3

Steve working on the combings

June 3

New combing pieces in place.

June 3

The crew working on the combings

June 3

The new signature board

June 17

The signature wall...finished!

June 17

Steve & Chief installing the combing - Stu on vacuum detail

June 17

Flotation installed

June 17

Aluminum clips bolted & hysoled in place to hold combings

June 17

Custom tube clamps by Wheeler

June 24

Engine and cockpit combings coated and faired.

June 24

Oil overflow tank brackets by Wheeler (1)

June 24

Oil overflow tank brackets by Wheeler (2)

June 24

Engine ID

June 24

Ron putting the "touch" on the chine

June 24

Ron establishing the shear line

June 24

Right sponson shear line

JULY 2006

July 1

Chief giving Alan a ride in his Hot Rod

July 1

Steves friend, Mike Koutonen, signing the door

July 1

Batten time!

July 1


July 21


July 21

Strut reinforcement

July 21


July 21


July 21


July 21

Larrys custom name plate for the front of the '55 Chev

AUGUST 2006

August 13

Summer Party at the Fullers

August 13


August 13


August 13

Old Cars

August 13

More Old cars

August 13

The Fuller Race Course

August 13

The "Pits"

August 13

Heat 1B(eer)

August 13

The Start!

August 13

Winner Jere Heiser with Runner-up Don Mock

August 19

Rob and Larry working on the lifting rings

August 19

Engine compartment deck corner pieces will be laminated Mahogany plywood

August 26

Larry putting the final planing on the engine compartment combings

August 26

Robs 1961 Dodge Army truck

August 26

U-60 engine rail material

August 26

The engine rails of the U-3

August 26

Rob scribing the tail cowlings

August 26

Getting closer

August 26

Alan needed to see how everything fits

SEPTEMBER 2006

Sept 2

Mock-up tail with original trim tab

Sept 2

Design Layout

Sept 2

Driver?!?!?!?!

Sept 16
Cockpit blocking/corners

Sept 16
Steve cutting the bottom rib to make room for the stuffing box

Sept 16


Sept 16



Sept 16
Shaft log insert

OCTOBER 2006

October 14
Chief working on the cowling trim

October 14
Shaft log liner in place

October 14
Cockpit combing (the wood is Padouk)

October 21
Alan photo documenting for the Wahoo

October 21
Blocking for fuel filler

October 21
Firewall brackets attached to dash cowling

October 21
Chief fixing the oil leak

NOVEMBER 2006

November 4
Larry trying to take Chiefs "Sparky" nickname away

November 4
The "Wheeler Spring" method of holding the butt block

November 4
Battery tray

November 4
Fuel pump and Fire bottle

November 4
Another angle to show actual location

November 4
Chief modifying the fire wall

November 4
Rob getting the bow ready for deck

November 4
Alan sanding on one of the lifing eyes

November 4
Sponson butt blocks

November 4
Just needs fairing then DECK!

November 5
Alan working on installing the lifting eyes

November 5
Front of engine compartment filler pieces

November 6
First piece clamped and getting pilot drilled

November 6
Glue's spread so now it's getting attached for real

November 6
Larry installed the lifting eyes and Chief's designing the fuel block

November 6
The first deck piece is installed!

November 6
Bow cleat fits!

November 7
This is how we hold the compound curve in place while we fit the joint

November 7
Right bow deck

November 8
The bow pieces in place

November 8
The decking team!

November 9
More Deck pieces are being formed

November 9
Chief and Scooter putting the seal coat on the back of the next pieces to be attached

November 10
Completed bow with cleat

November 10


November 18
Steve fitting the last deck piece

November 18
The hull ALMOST complete

November 25


November 25


November 25


November 25
Left side deck curve doublers being glued

DECEMBER 2006

December 9
Steve getting ready to install the second sheet on the tail

December 9
Larry is sanding on the Left side deck curve, Alan is cleaning up glue drips and Stuart is detailing the engine bay.

December 9
Dash cowl with stainless engine turn and cowling support pieces attached

December 9
On the boat!

December 9
Our collection of gauges for the dash

December 9
Flash pan corner supports

December 9
Right side deck curve doublers Done!!!!

December 9
Left side deck curve doublers Done!!!!

December 30
Steering box & dash cowl attached

December 30
Electrical harness connection

December 30
Oil tank and Flash pans in place

December 30
Screw line attaching the deck to the airtrap

December 30
Wheeler on the mill...smokin'!

December 30
Do you think it will line up?

December 30
I dunno...let's make some bushings and put the shaft in to see!

December 30
Oh my....it DOES!